一、混凝土快速養(yǎng)護箱是我公司依據行業(yè)標準T0509-94《水泥膠砂強度快速試驗》設計制造。適用于水泥廠、建筑施工、科研等單位對普通硅酸鹽水泥,礦渣水泥,火山灰水泥、粉煤灰水泥的試塊進行快速養(yǎng)護。適用于水泥廠,建筑科研施工單位對所有混凝土試件進行快速恒溫養(yǎng)護,可在24小時內預測出3天、7天、23天齡期的抗壓、抗折試驗結果,縮短水泥檢驗周期。
First, the concrete rapid curing box is designed and manufactured by our company in accordance with the industry standard T0509-94 "Quick Test of Cement Mortar Strength". It is suitable for cement plants, building construction, scientific research and other units to quickly maintain test blocks of ordinary portland cement, slag cement, pozzolan cement, and fly ash cement. It is suitable for cement plants, and the construction scientific research and construction units conduct rapid and constant temperature curing of all concrete specimens, and can predict the compression, flexural test results of 3 days, 7 days, and 23 days within 24 hours, shortening the cement inspection cycle.
二、混凝土快速養(yǎng)護箱技術參數(shù):
★有效容積 0.12m3
★可放試塊 150×150×150九塊
★溫控范圍 室溫—100℃
★溫控精度 ±2℃
★溫控方式 自動
★A長溫控時間 9999min
★加熱器總功率 10kW
★電源 AC380V 50HZ
★溫控范圍:室溫0-100℃
★時間控制:0.5-24小時
★加熱功率:1000W/220V
★內箱尺寸:A型:750mm×550mm×550mm(可放置2組混凝土試模)
B型:550mm×350mm×320mm
Technical parameters of rapid concrete curing box:
★ Effective volume 0.12m3
★ Can put test block 150 × 150 × 150
★ Temperature control range
★ Temperature control accuracy ± 2 ℃
★ Temperature control method
A long temperature control time 9999min
★ Total heater power 10kW
★ AC380V 50HZ
★ Temperature control range: room temperature 0-100 ℃
★ Time control: 0.5-24 hours
★ Heating power: 1000W / 220V
★ Inner box size: Type A: 750mm × 550mm × 550mm (can put 2 sets of concrete test molds)
Type B: 550mm × 350mm × 320mm
三、混凝土快速養(yǎng)護箱使用方法:
★箱體安放平穩(wěn)后, 先檢查電器部分有無原件損壞,線路是否接觸良好,插好傳感器和加熱器插頭。設備必須有可靠接地。
★開箱加水高約60mm。試塊成型后,常溫存放7小時或標養(yǎng)3小時,觀察接近終凝時,(根據水泥成分不同,應自行注意觀察,接近終凝時間)隨同試模一起放入箱內擱架上。
★蓋好箱蓋,插好溫度傳感器,根據各廠水泥成分不同,設定溫度和工作時間。
★ 試驗結束,取出試模放置常溫處,到試塊恢復常溫時,拆開試模,取出試塊,即可進行抗折、抗壓試驗。
★試驗結束后,放水并擦干內箱。
★根據水泥種類不同,可采用恒溫65-80℃之間進行,標準與快速對比試驗10-20次,找出比值或差值,得出標準檢驗結果
★溫度設定
溫控儀通電后,上排顯示為當前箱體內溫度,下排顯示設定溫度。此時,可用“∧”,“∨”鍵設定溫度值。綠燈亮表示開始加溫,閃爍表示恒溫狀態(tài)。 長期使用后,傳感器出現(xiàn)零點漂移,當漂移超出試驗要求范圍,則需調整。具體操作如下:按下“SET”鍵3秒,溫控儀進入參數(shù)調整狀態(tài),此時,上排顯示所調整的項目,下排為對應數(shù)值,繼續(xù)點動“SET”鍵,直到上排顯示“SC”,此時可按“∧”,“∨”鍵,調整下排數(shù)值,進而修正正負偏差。其它參數(shù)不建議修改,如須修改,請參照所附溫控表使用說明書。
★混凝土快速養(yǎng)護箱時間設定
接通電源后,4位數(shù)碼管顯示“00:00”,按“設置/查詢”按鈕,此時被設定位開始閃爍,可按“加數(shù)”按鈕置數(shù),按“移位”鍵可設定下一位數(shù)(從左到右)。設定好時間后按“啟動”鍵,設備開始工作,計時從0開始,到達設定時間后,蜂鳴器響,提示保溫時間到,可取出試塊。試驗中,當操作人員想查看設定時間為多少時,可按下“設定/查詢”鍵,數(shù)碼管顯示設定時間,再次按下“設定/查詢”鍵,設備繼續(xù)工作,(查詢后不能按“啟動”鍵)。定時結束后按下“設定/查詢”鍵即可令蜂鳴器停響。
Third, the use of rapid concrete curing box:
★ After the cabinet is installed smoothly, first check the electrical parts for damage to the original parts and whether the lines are in good contact. Plug the sensor and heater plugs. The equipment must be reliably grounded.
★ Unpacking and adding water is about 60mm high. After the test block is formed, it is stored for 7 hours at room temperature or 3 hours at standard temperature. When it is observed to be near the final setting, (depending on the composition of the cement, you should pay attention to it and approach the final setting time).
★ Close the lid of the box, insert the temperature sensor, and set the temperature and working time according to the cement composition of each plant.
★ After the test, remove the test mold and place it at normal temperature. When the test block returns to normal temperature, disassemble the test mold and remove the test block to perform the flexural and compressive test.
★ After the test, drain the water and dry the inner box.
★ Depending on the type of cement, constant temperature 65-80 ° C can be used. Standard and rapid comparison tests 10-20 times, find out the ratio or difference, and get the standard inspection results.
★ Temperature setting
After the temperature controller is powered on, the upper row shows the current temperature inside the cabinet, and the lower row shows the set temperature. At this time, you can use "∧" and "∨" keys to set the temperature value. The green light is on to indicate the start of heating, and the flashing indicates constant temperature. After long-term use, the sensor has zero drift. When the drift exceeds the range required by the test, it needs to be adjusted. The specific operation is as follows: Press the "SET" key for 3 seconds, the temperature controller enters the parameter adjustment state. At this time, the upper row displays the adjusted item, and the lower row is the corresponding value. Continue to jog the "SET" key until the upper row displays "SC", at this time, you can press the "∧" and "∨" keys to adjust the lower row value, and then correct the positive and negative deviation. It is not recommended to modify other parameters. If you need to modify, please refer to the instruction manual of the attached temperature control meter.
★ Time setting of rapid concrete curing box
After the power is turned on, the 4-digit digital tube displays "00: 00", and press the "Set / Query" button. At this time, the set bit starts to flash. You can press the "Add" button to set the number, and press the "Shift" key. Set the next digit (from left to right). After setting the time, press the "Start" key, the device starts to work, the timing starts from 0, when the set time is reached, the buzzer sounds, indicating that the holding time is up, you can remove the test block. In the test, when the operator wants to check the set time, he can press the "Set / Query" key, the digital tube displays the set time, press the "Set / Query" key again, the device continues to work, (Query You cannot press the "Start" key afterwards). After the timer is over, press the “Set / Query” button to stop the buzzer.
四、混凝土快速養(yǎng)護箱安全注意事項
★加速養(yǎng)護箱蓋在使用過程中請勿倒放(可依箱蓋上提示標牌文字正視位置為準)。
★放置試件時應留測溫探頭的對應位置,以免探頭插入時損壞。
★ 試件在放入和取出時一定要注意安全,即在使用專用工具鉤起試件時必需確認工具鉤是否已穩(wěn)穩(wěn)地鉤牢試件,以防操作中途試件脫落箱內熱水飛濺傷人。
★ 加速養(yǎng)護箱使用結束后必須切斷電源,防止電熱管無意中尚處于加熱狀態(tài),造成脫水損機現(xiàn)象。
★加速養(yǎng)護箱長期不用時需將水放盡擦干,放在通風干燥處。
Fourth, safety precautions for rapid concrete curing box
★ Do not place the cover of the accelerated curing box upside-down during use (you can follow the position of the label on the box cover).
★ The corresponding position of the temperature probe should be kept when placing the test piece, so as to avoid damage when the probe is inserted.
★ When putting in and taking out the test piece, please pay attention to safety, that is, when using the special tool to hook up the test piece, you must confirm whether the tool hook has firmly hooked the test piece to prevent the test piece from falling off in the middle of operation. Hurt.
★ After the accelerated curing box is used, the power must be cut off to prevent the heating pipe from being inadvertently heated, which will cause dehydration and damage to the machine.
★ When the accelerating curing box is not used for a long time, it is necessary to dry the water thoroughly and put it in a dry and ventilated place.
五、混凝土快速養(yǎng)護箱結構:
箱體由內、外箱體和保溫層組成。內外箱均采用優(yōu)質不銹鋼焊接成型。內外層之間填充有優(yōu)質保溫層。箱體與箱蓋之間采用水槽密封。
Fifth, the rapid concrete curing box structure:
The box body is composed of an inner box and an outer box and an insulation layer. The inner and outer boxes are welded with high-quality stainless steel. The inner and outer layers are filled with a high-quality insulation layer. A water tank seal is used between the box body and the box cover.