干篩法土工布有效孔徑測(cè)定儀概述:
該儀器適用于干篩原理測(cè)定單層土工布及其有關(guān)產(chǎn)品特征孔徑的方法,土工布有效孔徑測(cè)定儀適用于所有類型的土工布產(chǎn)品。
Overview of dry sieve geotextile effective aperture tester:
This instrument is suitable for the method of measuring the characteristic aperture of single-layer geotextiles and related products on the principle of dry sieve. The effective aperture measuring instrument of geotextiles is applicable to all types of geotextile products.
干篩法土工布有效孔徑測(cè)定儀符合標(biāo)準(zhǔn):
GB/T 14799, ASTM D4751, JTG E50 T1144, SL/T 235-1999等。
Dry sieve geotextile effective aperture tester meets standards:
GB / T 14799, ASTM D4751, JTG E50 T1144, SL / T 235-1999, etc.
干篩法土工布有效孔徑測(cè)定儀主要技術(shù)規(guī)范:
★篩子直徑:200mm
★篩子疊高:400mm
★篩座振幅:8mm
★篩搖動(dòng)次數(shù):221次/分
★振擊次數(shù):147次/分
★回轉(zhuǎn)半徑:12.5mm
★功率:0.37千瓦
★外型尺寸:600x400x880mm
★總重量:130公斤
Main technical specifications of dry sieve geotextile effective aperture tester:
★ Sieve diameter: 200mm
★ Sieve stack height: 400mm
★ Sieve base amplitude: 8mm
★ Sieve shaking frequency: 221 times / minute
★ Vibration times: 147 times / minute
★ Turning radius: 12.5mm
★ Power: 0.37 kW
★ External dimensions: 600x400x880mm
★ Total weight: 130 kg
干篩法土工布有效孔徑測(cè)定儀主要有機(jī)座、上蓋、回轉(zhuǎn)機(jī)構(gòu)、振擊機(jī)構(gòu)、夾緊機(jī)構(gòu)與套篩組成,主要結(jié)構(gòu)說明如下。
回轉(zhuǎn)機(jī)構(gòu)
電動(dòng)機(jī)(1A)與離合體(146A)轉(zhuǎn)動(dòng)軸套(14 )一得齒輪(13 )通過齒輪(152A)而帶動(dòng)齒輪軸(137A)上的小斜齒輪(141A)轉(zhuǎn)動(dòng),小斜齒輪帶動(dòng)大斜齒輪(97A)使以鍵與之連接的空心的主偏心軸(74A)旋轉(zhuǎn),從而帶動(dòng)以120度均布與上蓋(3A)上的三個(gè)副偏心軸(1 )回轉(zhuǎn),使整個(gè)活動(dòng)架得到半徑等于偏心距正圓平面搖動(dòng)。
振擊機(jī)構(gòu)
在活動(dòng)架得到正圓平面搖動(dòng)的時(shí)候,通過以螺釘與之固連的主偏心上蓋(70A)帶動(dòng)打擊軸(109A)回轉(zhuǎn),使打擊軸上的上端面凸輪(0 )轉(zhuǎn)動(dòng),同時(shí)齒輪由(137A)上的齒輪(164A)通過齒輪(157A)(159A)帶動(dòng)齒輪軸100下端面凸輪(107A)慢速旋轉(zhuǎn),上下端面凸輪同向轉(zhuǎn)動(dòng)產(chǎn)生軸向位移造成打擊軸往上頂起,直到上下平面凸輪缺口處 往下掉而得到振擊運(yùn)動(dòng)。壓縮彈簧(78A)的作用是增強(qiáng)打擊力量之用。
加緊結(jié)構(gòu)
旋轉(zhuǎn)扭緊螺栓(5 )可使退撥落螺母(54A)高軸向運(yùn)動(dòng),使篩蓋固定頂桿(47A)往外伸長(zhǎng)從而頂死篩蓋倒桿達(dá)到固定篩蓋的目的。
潤(rùn)滑系統(tǒng)
本結(jié)構(gòu)潤(rùn)滑簡(jiǎn)單,軸承全部用潤(rùn)滑脂——黃油潤(rùn)滑,而齒輪和偏心軸與主(付)偏心軸的潤(rùn)滑都是飛濺潤(rùn)滑。注:油咀(20A)可在付偏心出加機(jī)油,每班必須加機(jī)油一次,以防飛濺不到。主機(jī)必須加機(jī)油10kg,如缺潤(rùn)滑油,潤(rùn)滑系統(tǒng)出現(xiàn)故障,本廠概不負(fù)責(zé)。
自動(dòng)停車裝置
電源開關(guān)接通后,用定時(shí)器通過中間繼電器控制電動(dòng)機(jī)長(zhǎng)期運(yùn)轉(zhuǎn)或定時(shí)運(yùn)轉(zhuǎn),停止運(yùn)轉(zhuǎn)。為了保證安全工作,本機(jī)點(diǎn)擊托盤裝有接地線螺釘,用戶必須按規(guī)程接地。
The dry sieve method for measuring the effective aperture of geotextiles is mainly composed of a machine base, an upper cover, a slewing mechanism, a vibrating mechanism, a clamping mechanism and a sleeve screen. The main structure is described below.
Slewing mechanism
The motor (1A) and the clutch body (146A) rotate the shaft sleeve (14 ), and the gear (13 ) drives the small helical gear (141A) on the gear shaft (137A) to rotate through the gear (152A). The gear drives the large helical gear (97A) to rotate the hollow main eccentric shaft (74A) connected by the key, thereby driving the three auxiliary eccentric shafts (1 ) evenly distributed on the upper cover (3A) at 120 degrees. Rotate to make the entire movable frame shake with a radius equal to the eccentricity from the perfect circular plane.
Vibration mechanism
When the movable frame is shaken by a perfect circular plane, the main eccentric upper cover (70A) connected with the screw drives the striking shaft (109A) to rotate, so that the upper end cam (0 ) on the striking shaft rotates, and The gear is driven by the gear (164A) on (137A) through the gear (157A) (159A) to drive the lower end cam (107A) of the gear shaft 100 to rotate slowly. The upper and lower end cams rotate in the same direction to generate axial displacement, which causes the striking shaft to rise upward. , Until the upper and lower flat cam notches fall down and get the percussion motion. The role of the compression spring (78A) is to increase the strike force.
Tightening structure
Rotating and tightening the bolt (5 ) can make the high-axle movement of the pull-down nut (54A), so that the fixed cover (47A) of the sieve cover is extended outward, so that the inverted cover of the sieve cover is fixed.
Lubrication system
This structure is simple in lubrication. All bearings are lubricated with grease-butter, while the lubrication of gears, eccentric shafts and main (sub) eccentric shafts are all splash lubrication. Note: The oil nozzle (20A) can be used to add oil at the eccentric position. You must add oil once per shift to prevent splashing. The main engine must be filled with 10kg of oil. Our factory will not be responsible for any failure of the lubrication system or lubrication system.
Automatic parking device
After the power switch is turned on, the timer is used to control the motor for long-term operation or timing operation through the intermediate relay to stop the operation. In order to ensure safe work, the click tray of this machine is equipped with a ground wire screw, and the user must ground according to the regulations.
干篩法土工布有效孔徑測(cè)定儀安裝:
可以不用水泥基礎(chǔ),直接安放水泥地面上開動(dòng),也可以安裝在水泥基礎(chǔ)上,基礎(chǔ)螺釘尺寸如圖,其厚度300mm,基礎(chǔ)露地面高度及大小或與地面相平,根據(jù)具體使用需要而定,按電工規(guī)程安裝電路與接地,安裝完畢,接通電源后電動(dòng)機(jī)回轉(zhuǎn)方向與箭頭相同 有振擊運(yùn)動(dòng),若相反,則電機(jī)空運(yùn)轉(zhuǎn),此時(shí)可換接頭線,才能正常開動(dòng)。
使用和保養(yǎng):
開機(jī)前,擰出(15 )上螺塞,加足潤(rùn)滑油至螺孔面,裝套篩時(shí)先將扭緊螺栓(5 )左旋以松開篩蓋固定頂桿(47A)然后連同篩蓋(43A)往上提,然后右旋固定可置套篩托盤(62A)上在將扭緊螺栓左右松開往下壓并右旋之使固定緊即可工作。根據(jù)工作需要,時(shí)間任意設(shè)置,需要中途停機(jī),應(yīng)切斷電源開關(guān)。此儀器保養(yǎng)簡(jiǎn)單,每隔3-6個(gè)月更換墊子出一次,使用時(shí)注意避免蓋板上的七根倒桿的變形。
結(jié)束注意:
必須注意防潮,防腐蝕,使用兩年左右需清洗加油一次。
Installation of dry sieve geotextile effective aperture tester
It can be installed directly on the cement floor without using the cement foundation, or it can be installed on the cement foundation. The size of the foundation screw is shown in the figure, its thickness is 300mm, the height and size of the foundation exposed on the ground or the level is flat. The electrician regulations install the circuit and ground. After installation, the direction of rotation of the motor is the same as the arrow after the power is turned on. There is vibration motion. If it is the opposite, the motor runs dry. At this time, you can change the connector line to start normally.
Operation and maintenance of dry sieve geotextile effective aperture tester
Before starting the machine, unscrew the upper plug (15 ) and add enough oil to the surface of the screw hole. When installing the screen, turn the tightening bolt (5 ) to the left to loosen the screen cover and fix the top post (47A). Lift up the sieve cover (43A), then turn the fixed set screen tray (62A) to the right, loosen the tightening bolts left and right, press down, and turn the right to make the fixing work. The time can be set arbitrarily according to the needs of the work, and the power switch should be turned off if it needs to be stopped halfway. This instrument is easy to maintain. Replace the mat every 3-6 months. When using it, be careful to avoid deformation of the seven inverted bars on the cover.
End of dry sieve geotextile effective aperture tester
Must pay attention to moisture and corrosion, you need to clean and refuel once in about two years.